From:                              route@monster.com

Sent:                               Thursday, April 07, 2016 11:54 AM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: p6 Scheduler

 

This resume has been forwarded to you at the request of Monster User xapeix03

Gere Minnick 

Last updated:  05/06/15

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


Granite Shoals, TX  78654
US

Mobile: 7134084185   
wdfisher57@aol.com
Contact Preference:  Mobile Phone

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: Gere Minnick - contract SD/TA planner/scheduler

Resume Value: 7zfcgecn6wwdxvwq   

  

 

201 E Castlewood,

Granite Shoals,

Texas 78654

713-408-4185 Cell

Wdfisher57@AOL com

Gere Minnick-Planner/Estimator                                       

Experience

 

 

 

 

 

03/10/2015 – 04/02/2015    WestPro, LLC,   Wyoming Refinery, Newcastle, Wyoming             SD/TA Piping Planner/Scheduler

 

·   Using client provided Piping Isometric drawings, I calculated all man-hour’s required to fabricate, test and install the piing spools for the April 2015 Heater Piping Upgrade SD/TA Tie Ins. I also created a BOM per piping Isometric drawing, along with a stepped out plan of activities needed to install each line.

 

·   I then assisted a Sr. P6 Scheduler in building a Level 1, P6 based rough schedule for the Tie In work required during the TAR phase of this project using the information I had accumulated from the drawings and various walk thru’s with the contractor already engaged with performing the TA work.

 

·   Again using client provided Piping Isometric drawings, I calculated all man-hour’s required to fabricate, test and install the piing spools for the concurring April-October 2015 Exchanger Modules Piping Upgrade project. I created a BOM per piping Isometric drawing for this project as well, along with a Man-hour total and step out package for each Line to be erected.

 

·   Using my Level 1 schedule, I added the second TA to it and I helped the scheduler to perform the necessary logic ties and manipulated the milestone Activities to complete this schedule in the timeframe that my contract was negotiated for.

 

·   I was given a clean ROF after successfully completing this project.

 

02/16/2015 – 02/27/2015    WestPro, LLC,   NCRA Refinery, McPherson, Kansas             SD/TA Planner

 

·   Planned various work packages included in the March 2015 Refinery SD/TA in the Area 426A Vacuum Unit. Planned the activities and man-hours for the Tube replacement, I&E upgrades, and burner replacement work on the HF-0011 Vacuum Heater utilizing Turner Industries Quick Plan estimating software package.

 

·   Assisted QAQC Department by performing walk thru’s on work packages to capture new work done during PRE-T/A phase that could possibly be signed off as COMPLETE by Plant Operations.

 

·   Due to Turner Group’s corporate policy concerning third party access to their company data bases, my position  ultimately was eliminated after a two week period when it was deemed by upper corporate management that company policy specified that I could not have the access, that  I needed to perform the full scope of my SD/TA duties.

 

·   I received a clean, reduction in force lay off and all demobilization monies I had in my contract, with an apology from the site management who had hired me, for my troubles.

 

 

11/01/2013 – 12/19/2014    WTMC,   BP-AMOCO Refinery,  Whiting, Indiana               Jr. Scheduler

 

.

 

·   I was tasked with assembling relevant equipment data used in creating standard work packages to relieve the backlog of Relief Valve Compliance PPM’s found within the Hydro Power South, North and Utilities areas at the BP Whiting refinery. I performed this work utilizing SAP inside a computer based maintenance system. I completed this task successfully and my contract was extended thru the end of the 2014 calendar year.

 

·   Personally walked out and estimated/planned routine maintenance work and built work packages containing BOMs, P&IDs, pictures of the work being anticipated, MSDS’s, and previous Inspection reports. Worked with the union workforce supervisors to help define 2 month look ahead work schedules to perform the work included in my packages. In the process of doing this, I made notes on deficiencies I had found pertaining to relief valve status, its physical location, and whether or not they were still in place or had been removed from service for a wide variety of reasons after the plant had went thru a major renovation during the 2009-2013 time period.

 

·   I sent this information up to BP operations/ management, who then directed me as to whether I should deactivate or flag these valves for deletion in the active SAP work schedule. During this process I reviewed and corrected any/all resource code errors contained in the Work Plans and or active Maintenance Orders at the request of the Scheduling Department.

 

·   Developed and implemented routine naming conventions for all the work orders found within SAP pertaining to my areas of responsibilities in the various Hydropower operations units.

 

·   Upon completing the Relief Valve Project, I was similarly tasked to work on the backlog of Pump Repair PPM’s in both the APS and FCU Complexes at this same refinery, again tasked with implementing revised routine naming conventions for all the work orders found within SAP pertaining to my new areas of responsibility in both the APS and FCU operations units.

 

·   I successfully completed this last task and was informed that my last work day onsite would be 12/19.2014.

 

 

09/16/2012 - 05/16/2013    Zachry Holdings Incorporated,   San Antonio, Texas    Piping Estimator 11

 

·   Piping Estimator 11- Assigned to review pre-bid estimate documents so as to determine all piping quantities required to perform conceptual work-hour and materials labor and cost estimates on a variety of multi million dollar power generating plants scheduled to be constructed throughout the US. This included coal, natural gas, and nuclear power facilities, as well as a few petro chemical process piping projects. I also worked on a number of smaller scale replacement in kind piping projects while with this company.

 

·   Utilized ZHI’s in house, historical project database to help establish baselines to base various conceptual estimates upon when documentation was not available or forthcoming from our clients and working partners.

 

·   Estimated all craft man-hours, material costs, labor rates, scaffolding requirements, BOM’s, insulation needs, hydro-testing, stress relief and x-ray needs, as well as painting requirements and construction equipment needs.

 

·   Utilized both of ZHI’s PF$ and Hard Dollar Pipe estimating software systems while in this position.

 

·   Work on a number of smaller scale replacement in kind piping projects.

 

·   Performed jobsite visits to verify the accuracy of the bids we had produced.

 

·   My position was deleted due to general work downturn in the economy.

 

02/06/2012- 05/02/2012    Clifton Planning Inc. Wynnewood Refining, Wynnewood, OK Capital Projects Planner

Contract Capital Projects Planner- Planned, documented and was responsible for all activities to be performed on a variety of Capital Work Projects to be completed prior to and or during the 2012 Wynnewood, OK Refinery plant-wide SD/TA.

 

·   Gathered all relevant historical documentation from clients computerized maintenance database and records, utilizing Clifton Planning’s proprietary, template based software to plan and then perform Inspection’s driven Capital Projects work. Estimated all man-hours, scaffolding requirements, BOM’s, insulation needs, Hydro-testing materials, and equipment needs.

 

·   Responsible for Estimating and Planning (35) separate piping projects relating to multiple unit Heaters, Drums, Towers, Exchangers, Fin Fans, Filters and Pumps.

 

·   Determined all post FW- Hydro Test Blinding needs, ordered the necessary bolting and gaskets required, and assembled and marked up a set of relevant P&ID drawings for each Capital Work Package by Work Order.

 

 

 

·   Performed construction contractor oversight duties to verify and document actual progress made in the pre-turnaround, capital project installation phase of this project.

 

·   Wynnewood Refinery sold, and new corporate management out of Kansas takes over the Capital Project phase of this turnaround. My contract concluded.

11/14/2011- 01/20/2012      BEI Group    Valero Refinery, Houston, TX Contract SD/TA Planner

Contract Shut Down/Turn Around Planner- Planned, documented and was responsible for all activities to be performed during the Fluid Cat Cracking Unit SD/TA at the Valero-Houston Refinery, relating to unit Drums, Exchangers, Fin Fans and Towers.

 

·   Gathered all relevant historical documentation from clients computerized maintenance database (Innovative Plant Server) necessary to plan and then perform 10-year Inspection driven work. Estimated all man-hours, scaffolding requirements, insulation needs, material and equipment estimates.

 

·   Built various stepped out work templates for use by Contract Schedulers in developing the project schedule.

 

·   Built an Excel spreadsheet to capture all of the possible bolting replacement requirements for the various Heat Exchangers being disassembled and sent out for repairs, as well as a traveler package (Tag, MSDS, U-I Form) for each of the items being sent.

 

·   Identified (size, length and thread style) plug and gasket needs, then spoke with local approved vendors to determine availability for use in Fin Fan Overhauls and cleaning.

 

·   Walked 51 AWR PSV’s to be included in and serviced during the TA that has been postponed until later this Fall 2012.

 

 

07/18/2011- 10/16/2011    Fluor- TRS Services   DuPont-Yerkes, Buffalo, NY        Contract Maintenance Planner

 

Contract Maintenance Planner- Tasked with Performing a Review of this Manufacturing facilities Work Plans and maintenance planning procedures. Was then tasked with making changes to various work documents and related procedures accordingly, with a heavy emphasis on Safety and OSHA regulatory compliance.

§        Edited then reprinted for further review, previously marked up historical database Work Plans for both Operations personal and Plant management. Worked on reducing the backlog of data entry work connected with completing work packages in this facilities SAP maintenance and tracking system.

§        Walked out various routine jobs with maintenance planning staff and wrote new Work Packages to cover the work that was discovered. These were then to be used as generic templates to help streamline and reduce redundant effort in the overall Planning process used at this jobsite.

§        Wrote the 80+ Job work plans (mechanical, instrumentation, and electrical) to be utilized during a three day, CORIAN Unit, Sheet Line1-SD/TA that was scheduled for 08/22/2011. Assisted the various DuPont planners in streamlining and organizing the file structure used to save and store all work plans generated in both the TEDLAR and CORIAN sheet production lines at the Yerkes facility.

§        Completed a similar review and wrote in excess of 175 Job work plans (mechanical, instrumentation, and electrical) for the TEDLAR Unit, Production line SD/TA that was scheduled for/completed between 9/29/2011 and 10/12/2011. It was deemed that I had successfully completed this assignment after the 2011 TEDLAR SD/TA was over.

05/13/2011 – 6/13/2011   Innovative Turnaround Controls, Pasadena, Texas     BP - TCR, Texas City, Texas     SD/TA Piping Field Planner

 

·   SD/TA Piping Field Planner - Walked out, then estimated and Planned multiple Piping Packages for the UU3 SD/TA scheduled for late 2011. To include stepping out each package (350+), taking pictures of each work list item, and then estimating all man-hour, material, scaffolding, insulation and lifting equipment needs to perform these jobs as determined by BP Engineering.

·   Utiliized ITC’s proprietary, planning database system “Innovative Plant Server” to capture and document electronically, all TA work to be performed.

07/20/2010 – 03/25/2011   KAP Project Services   LaPorte, Texas

DOW - Rohm & Haas     SD/TA Group - Field Planner/Estimator

 

§        SD/TA Planner/Scheduler – Utilized clients (DOW) Computer Maintenance Management System and SAP program to plan and estimate all work being performed on a $4.6 M project at the Rohm & Haas Chemical Plant in Deer Park, Texas for the 2011 NBA Unit MIT- Inspections SD/TA. This also includes locating and documenting all material and logistical needs for the Control and Pressure Relief Valves to be removed and sent out for Repairs during SD/TA.

§        Gathered all relevant historical documentation from clients computerized maintenance database necessary to perform man-hour, scaffolding, insulation, material and equipment estimates and then build individual work packages.

§        Coordinated with Material Procurement to assure on time delivery of all long lead material needs. Contacted various outside vendors for quotes on misc. specialty item procurement.

§        Walked out and developed various piping job plans, including manpower and material estimates for the Capital Projects work group in the NBA Tank Farm area.

§        In SAP, documented all BOM needs, proper spec requirements, complete activity and resource needs, and provided Operations and Inspections with complete job scopes for WO# release. Filled out database forms and then imported this data into a P3.1 plan load for use by project schedulers.

§        Will serve as project coordinator during TA to monitor and assist contractor (JVIC) performing scheduled work.

I created a Confined Space Entry Manual for all Equipment being entered for Inspection or Repairs during this TA. It is to be used by DOW Operations as a training manual after TA completed. I also included a separate PowerPoint slideshow for each Equipment package that showed every Blinding point and or Instrument to Disconnect required for each Entry permit, segregated by Equipment Number from Operations.

 

02/01/2010 – 03/05/3010   The Mundy Companies   Pasadena, Texas

SD/TA Planner/Scheduler

 

§        SD/TA Planner/Scheduler – Monitored Daily Job Progress and Performed schedule updates in a MS Project based SD/TA schedule while planning all discovery work w/ related material needs in an SAP database system for the 6 week, $1.8 M Evalca Spring 2010 plant wide PSM SD/TA in La Porte, Texas. Walked out daily scheduled jobsite activities to visually verify actual daily progress, then updated planning war board for client, while maintaining all job files, and printing out the daily work tickets for each crew foreman.

 

12/2008 to 1/15/09   The Turnaround Management Co.   Kemah, Texas

Maintenance PSV Planner

 

§        Maintenance PSV Planner - Assisted Exxon-Mobil, Torrance, Ca. Refinery Planning Group to expedite and complete their existing scheduled PSV Inspection and Repair Program for 2008, utilizing their in house TABWARE planning software package.

 

03/2006 to 10/2008      Fishbone Solutions Ltd.      Kemah, Texas.

SD/TA Planner/Field Scheduler/Estimator/Coordinator/Designer

 

§        Lead Planner/Piping Estimator – Routine Maintenance & $2.5M Project/New Construction – Flint Hills Refinery, Odessa, Texas

§        Shot and Established All Field Elevations with Engineering Transit. Field Routed a new 30# & 175# Steam Condensate Piping System with accompanying process skids, a new Hydrogen Truck loading rack, and replaced an existing Return/Supply Cooling Water header thru an operating Olefins unit. Verified All Tie-In Points, Field Dimensions/Measurements and Produced Detailed Isometric Piping drawings with BOMs as needed for shop fabrication on these Projects.

§        Estimated all piping and material quantities along with required man hours for calculating related work packages to assist development of the relevant budget requirements for the bid on this field installation.

§        Input Planning Data into Customized Microsoft Planning Platform, in Preparation for Migration to Primavera P3.1 for Windows

§        Served as designated Client Agent during Project Installation SD/TA Phase supervising sub contractor performance.

§        Developed multiple work packages for Olefins/Poly Plant, 10 year PSM Inspections SD/TA.

 

§        Lead Planner/Field Scheduler – SD/TA-TOTAL Refinery, Port Arthur, Texas

§        Input Planning Data into Customized Microsoft Planning Platform, in Preparation for Migration to Primavera P3.1 for Windows

§        Composition of Logic Ties in a Complex String of Activities in Excess of 11,000 +/- with Budgetary Amounts of Approximately $60mm for Multi Unit Turnarounds

§        Performed Schedule Updates by way of Data Input into Primavera P3.1 for Windows

§        Provide front end loaded schedule as well as complete ready to execute resource loaded logic driven schedule

§        Responsible for Material Procurement according to Pertinent Engineering Standards and Plant Specifications

 

§        SD/TA Piping Planner/Estimator- BCIP SD/TA Project, Exxon-Mobil Refinery, Beaumont, Texas.

§        Participated in Field Surveys with Exxon-Beaumont Engineering to verify and or determine all new piping work to be performed during the Fall 2005 SD/TA.

§        Established and labeled 350+ new process piping Tie In points to existing process piping systems in the field.

§        Calculated material quantity takeoffs and man-hours required for bid proposal and pre-T/A work assessment.

§        Built work packages, and assembled all required documentation (equipment and Isometric drawings, Pipe specifications, MSDS sheets, safety requirements, Inspection and testing forms, and QA/QC documents) to be given to and used by various subcontractors performing these piping revisions.

§        Planned Various Piping & Mechanical Jobs. Assembled Detailed Work Packages on PC in an Access based database.

§        Assembled PSV Travel documentation packages and tracked work progress for 500+ safety devices being sent out for R & R at offsite repair facilities.

§        Tracked Work Progress during various T/A’s in both Primavera P3.1 and Microsoft Project.

§        Renewed US Passport (2007)

 

01/2006–03/2006     P2S Inc.    Lake Charles, LA. Pipe Foreman

 

§        Piping Frontline Supervisor - Shutdown/Turnaround Assignment.

§        Refinery Process Piping Upgrade T/A, CITGO Refinery, FCC Lake Charles, LA.

§        Re-Tubed Piping and Retrofit Structural Steel on (3) Furnaces in FCC Unit.

§        Made major piping modifications and performed weld overlays throughout existing Cat Cracker Unit as determined by CITGO Inspections Department..

 

 

08/2005–11/2005     Brinderson’s Constructors   San Francisco, CA. Pipe Foreman

 

§        Piping Frontline Supervisor - Shutdown/Turnaround Assignment.

§        Refinery Process Piping Upgrade T/A, Chevron Refinery, FCC Richmond, CA.

04/2005-08/2005         Mundy Companies Inc.             Pasadena, Texas

Lead Field Planner/Estimator

 

§        Lead Planner/Piping Estimator - 2005 EVALCA, La Porte, Texas 3rd Phase Expansion Project

§        Estimated all new piping needs in existing Ethylene facility required to be able to accept the anticipated increase in product flow, and field routed new piping thru existing Olefins unit.

§        Produced detailed Isometric Drawings and BOMs for these new requirements

§        Coordinated Material Requisition and onsite Storage for this project.

§        Provided Daily Work Schedule to Maintenance Supervisors

§        Updated day shift Progress in P3 Schedule.

01/2005–4/2005     Brinderson’s Constructors    Los Angeles, CA. Pipe Foreman

 

§        Piping Frontline Supervisor - Shutdown/Turnaround Assignment.

§        Refinery Process Piping Upgrade T/A, Chevron Refinery, FCC El Segundo, CA.

 

 

2000-2004         JV Piping Inc.             La Porte, Texas

Lead Pipe Fitter/Pipe Foreman

 

§        Lead Pipe Fitter/Pipe foreman – SD/TA projects throughout the USA

§        Jan 2000-Aug 2000. Supervised Pipe Fabrication Shop Crew on Cooling Tower Repair and UG Piping Upgrade Installation Project @ Valero Refinery, Houston, Texas.

§        Dec/2001-Feb 2002. Pipe Foreman at Valero Refinery, Houston, Texas. 

§        (10) HP Sphere Structural Support Upgrade Project.

§        October 2003-Jan2004. Lead Pipefitter/Iron worker at KOCH Refinery CCU, Corpus Christi, Texas on scheduled Winter SD/TA.

§        Performed duties of a Lead Pipe Fitter on various piping upgrade SD/TA’s nationwide to include projects in Houston, Texas, Pasadena, Texas, Las Vegas, Nevada, Philadelphia, Pennsylvania, Franklin, Georgia, Corpus Christi, Texas, Texas City, Texas, and Deer Park, Texas.

 

 

 

03/1999-1/2000        Pasadena Piping and Plastics.            La Porte, Texas

Shop/Bid Estimator

 

§        Piping, Coatings and Bulk Tank Estimator – New Construction retrofits and SD/TA projects throughout the USA.

§        Reviewed Construction Drawings and Specifications needed to determine Material Take-off Estimates for use in the Bid process for a Specialty Plastics, Piping and Coatings firm. Performed onsite walk thru evaluations and determined man-hour requirements for shop fabrication of specialty tanks, totes and caustic system related, specialty coatings applications

 

10/1997–07/1998     Shaw-Bagwell Inc   Channelview, TX 3D Model Operator/Material Controls Person

 

§        3D Model Operator- Manned a Client requested 3D Model on a Multiple Offshore Production Platform build for Citgo-Venezuala joint venture at Marine Fab Yard in Houston, Texas..

     Field Engineer/Material Controls- Wrote all construction purchase orders and material requisitions, and issued all materials thru warehouse department for onsite distribution . Maintained all project documentation and records for this build. Walked out site and located all nonstandard specialty pipe supports required, made fabrication drawings for onsite shop, and had them fabricated for this project.

 

9/1979- 01/2000Kellogg Brown & Root             Houston, Texas

Pipe Fitter/ Foreman

 

§     3 years apprenticeship.

§     Have held Journeyman Pipefitter, Fabricator, Boilermaker, Heavy Rigger, Piping Crew Lead Man, Pipe Foreman, Construction Expeditor, Material Coordinator, Construction Estimator, Pipe Fab Shop Foreman and SD/TA Planner, Coordinator and Estimator positions on various New Construction and Maintenance SD/TA projects.

§     Projects included assignments in Refineries- (to include Crude Units, Coker Units, Cat Crackers, LPG Plants, Gas Plants, Oil Storage Tanks, Loading Dock Facilities, Boilers and  Steam Drums, Compressor Units, Distillation Units, Acid Plants, and on Pipelines). Oil Production Platforms- (In Onshore Fabrication Yards and performing Offshore installation of New Platforms).Chemical Plants-(to include Acetylene Units, Cyanide Units, Benzene Units, Poly/Olefin Units, Power Plants and Boilers, Reactors, Convection Heaters, Styrene Units, Alky Units, BPA Units, and Water Treatment Plants). Power Facilities-(to include Precipitator Units, 30 MW Units, Co-Gen Units). Misc. Industrial Settings- (to include Pulp Paper Mills, Paper Printing Press Facilities, Cement Factories, Bauxite and Mineral Processing facilities, and in various Pipe and Vessel shops) located across the United States and in the US Virgin Islands, with this company.

§     Highly experienced Pipe Fabricator working with Carbon Steel piping (.25-84”), Stainless Steel piping (.5-60”), Chrome Alloys (types 2.5, 5, 9, and12), Inconel and Monel alloys. Expert Screw pipe Fitter (.25-12”), With significant tubing (brass and SS) expertise.

§     Significant experience performing Heat Exchanger R/R and Testing, Internal Convection Column R/R and tray work, Process Valve replacement and re-packing, Pipe spool and Vessel Hydro-testing, PSV and relief valve R/R, and most general maintenance work assignments found in an Industrial and Petro Chemical job setting.

§   01/1986-02/1987 Fabrication Shop Foreman – Shell DPMC, (3) Consecutive SD/TA’s (Crude Unit, Bis-Phenol A Unit, OP2 Complex), Deer Park, TX.

§    05/1987-08/1987 Pipe Foreman – Rohm & Haas, Acetylene Unit SD/TA, LA Porte, TX

§    02/1989-12/1989 Pipe Foreman – Phillips 66 Plastics Plant, Polypropylene Reactor Units 5 & 6 Rebuild, Pasadena, TX

§    04/1994-12/1994 Piping QA/QC – Hess Refinery, 30MW Unit Installation, St Croix, USVI

 

§     05/1995-12/1995 Estimator/Pipe Foreman – BASF Reactor Project, Lake Jackson, TX

§    Taught Small Hand Tool Usage and Safety classes to Incoming Apprentices and helpers.

§     Received National  AABC certification as Journeyman Pipe Fitter in 1996

     Received NCCER certification as Journeyman Pipefitter & Boilermaker in 2000

§     Obtained US Passport and 10 Year Overseas Shot Record (1995)

08/1978-08/1979        A/C Duct Installer          Houston, Texas

Industrial/Commercial/Residential

 

§        Sheet Metal Duct Installer – Performed new duct work installations on a wide variety of new and existing Industrial, Commercial and Residential projects within the Houston/Galveston metro area in SE Texas, working with Sheet metal, Fiberglass and  Fiber board products. Project types to include schools, hospitals, churches, police stations, county municipal buildings, TV broadcast stations, banks and commercial restaurants

06/1977-08/1978        Sub Contractor           Houston, Texas

Deck Carpenter

 

§        Deck Carpenter – Installed Plywood subfloor decking and Roof Structures on newly constructed multi-story, single family homes and multi-family apartment complexes in NE Houston and Pasadena, Texas.

 

 

05/1976-08/1977        Reactor Services Inc.            Alvin, Texas

Boiler Technician

 

§        Boiler Tech – Reactor Core Catalyst change out work on various SD/TA projects throughout the USA.

§        Removed, filtered and then replaced heavy metals catalysts using specialized, self- contained trailer units. Performed various internal tray and component replacement and repairs as needed on Catalytic Reactor Units, while utilizing a SBA safety system and working inside an inert Nitrogen atmosphere. Eventually served as an A-team safety monitor observing others working under similar hazardous conditions.

 

11/1975-05/1976        Houston Merchants Exchange          Deer Park, Texas

Federal Grain Sampler/Lab Tech

 

§        Federal Grain Sampler – Took systematic Grain Samples of various grain types entering the Port of Houston Public Elevator and the Good Pasture Grain Elevators, used in testing for grade and to spot check for pest infestation prevention.

§        Federal Lab Tech – Worked up grain samples, testing for temperature, moisture content, and verifying grade prior to loading into elevator and or aboard ships for overseas sales.

§        Left this job after preparing all salvage documents required by the US government after grain elevator explosion and company’s demise.

 

 

Education

1975 - Graduated           Sam Rayburn High School       Pasadena, Texas

 

1995–2000San Jacinto Jr. CollegePasadena, Texas

§     A.A. Degree in Social Sciences

§     Graduated with Honors in English and American History.

§     Earned College Level Credits in ACAD 13/14, Microstation, Construction Design Graphics, Construction Planning and Scheduling utilizing Primavera P3.1 and SureTrak, Computer Maintenance, Computer Programming, Computer Networking, Construction Management, and Microsoft Office (Word, Excel, Access, Outlook, and Project)

 

2007-(FALL)            Midland Community College               Midland, Texas

§     Completed Comprehensive MS Excel Course

§     Completed Comprehensive MS Access Course

 

2008-(SPRING)       Successfully completed, and received certifications for nationally accredited, Online, (30) segment Industrial Safety and  Management

Course

 

(May 2010)  TEPCO-Team Enterprise Project Controls Org   Baytown, Texas

§     Successfully completed and received certification for Primavera P6v7.0 Project Management Basic-1013 course.

 

(Summer 2010)  Houston Community College                 Houston, Texas

§     Currently enrolled in a 4 month, Level III, Green Process Piping Design ,college accredited course (8 hrs), DFTG2457 and DFTG2432, utilizing ACAD 2010 which is being sponsored by the Society for Piping Engineers and Designers (SPED).at Houston Community College.

 

(April 20-25, 2015) WestPro LLC-Primavera 8.4 Scheduling   Mead, Colorado § Completed comprehensive Primavera scheduling coursework, focusing on proper Best practices WBS set up, RBS set up, CBS set up, activity coding, resource loading, and a three day walk thru on terminology routinely used in this software program.

§ Worked on completing planning logic ties (both external and internal),designating relationships in the plan, adding/removing steps in a plan in Primavera, adding both start and finish milestones, setting a baseline, and producing level one milestone report.

§ Successfully built a functionally correct, 1500 activity, Primavera schedule from scratch that was resource and activity code loaded, base lined, and that contained WO numbers, change orders, etc…using an actual client supplied work list w/ equipment coding.

§ Spent the  last  two days  doing some advanced cost control training which focused on updating the schedule, manpower leveling, changing timelines based on new discovery work found during the TA, running what if scenarios, for project management, and producing S curve reports and Gant charts.

§ Received a certificate for successfully completing this coursework

 

 

 

 

 

    

 

 

Woodworking, Motorcycling, Wade Fishing, Scuba Diving, Golf, and Pool.

 




Experience

BACK TO TOP

 

Job Title

Company

Experience

Planner/Scheduler

WestPro LLC

- Present

 

Additional Info

BACK TO TOP

 

Desired Salary/Wage:

50.00 - 60.00 USD hr

Current Career Level:

Experienced (Non-Manager)

Years of relevant work experience:

5+ to 7 Years

Date of Availability:

Immediately

Work Status:

US - I am authorized to work in this country for any employer.

Active Security Clearance:

None

US Military Service:

Citizenship:

US citizen

 

 

Target Job:

Target Job Title:

contract SD/TA planner/scheduler

Desired Job Type:

Temporary/Contract/Project

Desired Status:

Full-Time

 

Target Company:

Company Size:

Occupation:

Manufacturing/Production/Operations

·         Production/Operations Planning

Installation/Maintenance/Repair

·         Equipment Install/Maintain/Repair

Project/Program Management

·         Project Management

 

Target Locations:

Selected Locations:

US
US-TX-Austin

Relocate:

Yes

Willingness to travel:

Up to 100%

 

Languages:

Languages

Proficiency Level

English

Advanced